Ignition House / Tools / Go / no-go gates
House checklist · 03
Go / no-go gates
The checks between each stage of a build, the same gates used in Ignition House build packets. If any check fails, stop and fix it before you spend on the next stage.
Gate 0 — Before you start
- Compression or leak-down within spec
- Smoke test passed — no boost or vacuum leaks
- Timing belt or chain status known
- Budget set for this stage and the next
Gate 1 — Data ready
- Wideband reading and logged in the ECU
- Fuel pressure steady at idle and under load
- All sensors reading correctly in the software
Gate 2 — Base map verified
- Clean cold start and stable idle
- Part-throttle AFR on target
- Timing verified with a timing light
- No knock events in logs
Gate 3 — Ready for boost / power
- Fuel system headroom confirmed (injector duty and pressure)
- Boost control working at the lowest target
- Cooling stable after repeated pulls
- Dyno booked for high boost or race use
Gate 4 — Final
- All logs reviewed and signed off
- Final map backed up with notes
- The driver understands the limits and the warning signs
Ignition House · [email protected] · General guidance only. Follow your ECU manufacturer’s documentation, and get qualified help for anything you’re unsure about.